{"sections":[{"id":"s1","title":"Work, rate and the LCM method","hi":"काम, दर और LCM विधि","blocks":[{"t":"def","en":"<b>Work = Rate × Time.</b> If A finishes a job in n days, A's one-day work is <b>1/n</b> of the job.","hi":"<b>काम = दर × समय।</b> यदि A किसी काम को n दिन में पूरा करता है, तो उसका एक दिन का काम पूरे काम का <b>1/n</b> भाग होता है।"},{"t":"table","long":false,"head":["Question","Rule","Example"],"rows":[[{"en":"1-day work of an n-day worker","hi":"n दिन वाले का 1 दिन का काम"},{"en":"1/n","hi":""},{"en":"20 days → 1/20 per day","hi":"20 दिन → प्रतिदिन 1/20"}],[{"en":"Work done in t days","hi":"t दिन में किया काम"},{"en":"t/n","hi":""},{"en":"20-day worker, 5 days → 1/4","hi":"20 दिन वाला, 5 दिन → 1/4"}],[{"en":"Time for a fraction f of the job","hi":"काम के भाग f का समय"},{"en":"f × n","hi":""},{"en":"3/4 of a 20-day job → 15 days","hi":"20 दिन के काम का 3/4 → 15 दिन"}],[{"en":"Time to finish what is left","hi":"बचा काम पूरा करने का समय"},{"en":"left × n","hi":""},{"en":"1/4 left → 5 days","hi":"1/4 बचा → 5 दिन"}]]},{"t":"p","en":"<b>LCM method:</b> take the LCM of the given days as the total work, in units. Efficiency of each worker = total work ÷ days he needs. Now everything is whole-number arithmetic and no fractions are needed.","hi":"<b>LCM विधि:</b> दिए गए दिनों का LCM कुल काम (इकाई में) मानें। हर मज़दूर की कार्यक्षमता = कुल काम ÷ उसके लगने वाले दिन। अब सारा हिसाब पूर्ण संख्याओं में होता है, भिन्न नहीं चाहिए।"},{"t":"card","title":"Worked example","en":"A finishes a job in 12 days and B in 18 days. How long will they take together?<br><b>Step 1:</b> Total work = LCM(12, 18) = 36 units.<br><b>Step 2:</b> A = 36 ÷ 12 = 3 units/day. B = 36 ÷ 18 = 2 units/day.<br><b>Step 3:</b> Together = 3 + 2 = 5 units/day.<br><b>Answer: 36 ÷ 5 = 7.2 days.</b>","hi":"A किसी काम को 12 दिन में और B 18 दिन में पूरा करता है। साथ में कितना समय लगेगा?<br><b>चरण 1:</b> कुल काम = LCM(12, 18) = 36 इकाई।<br><b>चरण 2:</b> A = 36 ÷ 12 = 3 इकाई/दिन। B = 36 ÷ 18 = 2 इकाई/दिन।<br><b>चरण 3:</b> साथ में = 3 + 2 = 5 इकाई/दिन।<br><b>उत्तर: 36 ÷ 5 = 7.2 दिन।</b>"},{"t":"card","title":"Trap","en":"Efficiency is <i>inversely</i> proportional to time: twice as fast means half the time. Never add days (12 + 18 is not the answer). And if A does 1/3 of a job in 5 days, the full job takes 5 ÷ 1/3 = 15 days, not 5 × 1/3.","hi":"कार्यक्षमता समय के <i>व्युत्क्रमानुपाती</i> होती है: दोगुना तेज़ यानी आधा समय। दिनों को कभी न जोड़ें (12 + 18 उत्तर नहीं है)। और यदि A काम का 1/3 भाग 5 दिन में करता है, तो पूरा काम 5 ÷ 1/3 = 15 दिन में होगा, 5 × 1/3 नहीं।"}],"vis":["<svg viewBox=\"0 0 480 334\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><rect x=\"8\" y=\"8\" width=\"226\" height=\"46\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"121.0\" y=\"36.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">A: 12 days</text><rect x=\"246\" y=\"8\" width=\"226\" height=\"46\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"359.0\" y=\"36.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B: 18 days</text><line x1=\"121\" y1=\"56\" x2=\"121\" y2=\"76\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"121,76 116.6503446588877,66.99552897647322 125.34965534111231,66.99552897647322\" fill=\"#D62839\"/><line x1=\"359\" y1=\"56\" x2=\"359\" y2=\"76\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"359,76 354.6503446588877,66.99552897647322 363.3496553411123,66.99552897647322\" fill=\"#D62839\"/><rect x=\"8\" y=\"78\" width=\"464\" height=\"46\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"106.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Total work = LCM(12, 18) = 36 units</text><line x1=\"121\" y1=\"126\" x2=\"121\" y2=\"146\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"121,146 116.6503446588877,136.99552897647322 125.34965534111231,136.99552897647322\" fill=\"#D62839\"/><line x1=\"359\" y1=\"126\" x2=\"359\" y2=\"146\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"359,146 354.6503446588877,136.99552897647322 363.3496553411123,136.99552897647322\" fill=\"#D62839\"/><rect x=\"8\" y=\"148\" width=\"226\" height=\"46\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"121.0\" y=\"176.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">A: 36 ÷ 12 = 3 /day</text><rect x=\"246\" y=\"148\" width=\"226\" height=\"46\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"359.0\" y=\"176.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">B: 36 ÷ 18 = 2 /day</text><line x1=\"121\" y1=\"196\" x2=\"240\" y2=\"216\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"240,216 230.39914593299048,218.7970701070918 231.84099312503528,210.21807931442513\" fill=\"#D62839\"/><line x1=\"359\" y1=\"196\" x2=\"240\" y2=\"216\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"240,216 248.15900687496472,210.21807931442513 249.60085406700952,218.7970701070918\" fill=\"#D62839\"/><rect x=\"8\" y=\"218\" width=\"464\" height=\"40\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"243.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Together: 3 + 2 = 5 units/day</text><line x1=\"240\" y1=\"260\" x2=\"240\" y2=\"278\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"240,278 235.6503446588877,268.9955289764732 244.3496553411123,268.9955289764732\" fill=\"#D62839\"/><rect x=\"8\" y=\"280\" width=\"464\" height=\"46\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"309.3\" font-size=\"18\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">36 ÷ 5 = 7.2 days</text></svg>","<svg viewBox=\"0 0 480 224\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><rect x=\"8\" y=\"8\" width=\"228\" height=\"98\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"122.0\" y=\"42.6\" font-size=\"16\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Work</text><text x=\"122.0\" y=\"62.6\" font-size=\"22\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">Rate × Time</text><text x=\"122.0\" y=\"82.6\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">20 days: 5 days → 1/4</text><rect x=\"244\" y=\"8\" width=\"228\" height=\"98\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"358.0\" y=\"42.6\" font-size=\"16\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">One day</text><text x=\"358.0\" y=\"62.6\" font-size=\"22\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">1 / n</text><text x=\"358.0\" y=\"82.6\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">n = 20 → 1/20</text><rect x=\"8\" y=\"114\" width=\"228\" height=\"98\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"122.0\" y=\"148.6\" font-size=\"16\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">In t days</text><text x=\"122.0\" y=\"168.6\" font-size=\"22\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">t / n</text><text x=\"122.0\" y=\"188.6\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">t = 5, n = 20 → 1/4</text><rect x=\"244\" y=\"114\" width=\"228\" height=\"98\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"358.0\" y=\"148.6\" font-size=\"16\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Time left</text><text x=\"358.0\" y=\"168.6\" font-size=\"22\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">left × n</text><text x=\"358.0\" y=\"188.6\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">1/4 left → 5 days</text></svg>"]},{"id":"s2","title":"Working together","hi":"मिलकर काम करना","blocks":[{"t":"table","long":false,"head":["Situation","Time taken","Example"],"rows":[[{"en":"A and B alone take a and b days","hi":"A और B अकेले a और b दिन लेते हैं"},{"en":"ab/(a+b)","hi":""},{"en":"10, 15 → 150/25 = 6 days","hi":"10, 15 → 150/25 = 6 दिन"}],[{"en":"A, B, C alone take a, b, c days","hi":"A, B, C अकेले a, b, c दिन लेते हैं"},{"en":"abc/(ab+bc+ca)","hi":""},{"en":"10, 15, 30 → 4500/900 = 5 days","hi":"10, 15, 30 → 4500/900 = 5 दिन"}],[{"en":"A+B take x days, A alone y days: B alone","hi":"A+B x दिन, A अकेला y दिन: B अकेला"},{"en":"xy/(y−x)","hi":""},{"en":"12, 20 → 240/8 = 30 days","hi":"12, 20 → 240/8 = 30 दिन"}],[{"en":"A twice as fast as B; B alone x days: together","hi":"A, B से दोगुना तेज़; B अकेला x दिन: साथ में"},{"en":"x/3","hi":""},{"en":"B = 30 → 10 days","hi":"B = 30 → 10 दिन"}]]},{"t":"card","title":"Worked example","en":"A, B and C finish a job in 12, 15 and 20 days. How long together?<br><b>Step 1:</b> Total work = LCM(12, 15, 20) = 60 units.<br><b>Step 2:</b> A = 5, B = 4, C = 3 units/day.<br><b>Step 3:</b> Together = 5 + 4 + 3 = 12 units/day.<br><b>Answer: 60 ÷ 12 = 5 days.</b>","hi":"A, B और C एक काम को 12, 15 और 20 दिन में पूरा करते हैं। साथ में कितना समय लगेगा?<br><b>चरण 1:</b> कुल काम = LCM(12, 15, 20) = 60 इकाई।<br><b>चरण 2:</b> A = 5, B = 4, C = 3 इकाई/दिन।<br><b>चरण 3:</b> साथ में = 5 + 4 + 3 = 12 इकाई/दिन।<br><b>उत्तर: 60 ÷ 12 = 5 दिन।</b>"},{"t":"card","title":"Worked example","en":"A and B together finish a job in 12 days. A alone takes 20 days. How long does B alone take?<br><b>Step 1:</b> Total work = LCM(12, 20) = 60 units.<br><b>Step 2:</b> A + B = 60 ÷ 12 = 5/day. A = 60 ÷ 20 = 3/day.<br><b>Step 3:</b> B = 5 − 3 = 2/day.<br><b>Answer: 60 ÷ 2 = 30 days.</b>","hi":"A और B मिलकर एक काम 12 दिन में पूरा करते हैं। A अकेला 20 दिन लेता है। B अकेला कितने दिन लेगा?<br><b>चरण 1:</b> कुल काम = LCM(12, 20) = 60 इकाई।<br><b>चरण 2:</b> A + B = 60 ÷ 12 = 5/दिन। A = 60 ÷ 20 = 3/दिन।<br><b>चरण 3:</b> B = 5 − 3 = 2/दिन।<br><b>उत्तर: 60 ÷ 2 = 30 दिन।</b>"},{"t":"card","title":"Trap","en":"The shortcut ab/(a+b) is only for <i>two</i> workers. For three, the bottom is ab + bc + ca, not a + b + c. When in doubt, use the LCM method: it works for any number of workers.","hi":"सूत्र ab/(a+b) केवल <i>दो</i> मज़दूरों के लिए है। तीन के लिए नीचे ab + bc + ca आता है, a + b + c नहीं। शक हो तो LCM विधि लगाएँ: वह कितने भी मज़दूरों पर चलती है।"},{"t":"sticky","label":"Farha's trick","en":"Teen kaam yaad rakho: LCM lo, har bande ki efficiency likho, jodo ya ghatao, phir bhaag do. Formula bhool bhi jao to ye line kabhi fail nahi hoti.","hi":"तीन काम याद रखो: LCM लो, हर बंदे की efficiency लिखो, जोड़ो या घटाओ, फिर भाग दो। Formula भूल भी जाओ तो ये लाइन कभी फेल नहीं होती।"}],"vis":["<svg viewBox=\"0 0 480 324\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"26\" font-size=\"17\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Each day: 5 + 4 + 3 = 12 units</text><rect x=\"22\" y=\"185\" width=\"62\" height=\"75\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"53.0\" y=\"228.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">A 5</text><rect x=\"22\" y=\"125\" width=\"62\" height=\"60\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"53.0\" y=\"160.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">B 4</text><rect x=\"22\" y=\"80\" width=\"62\" height=\"45\" rx=\"8\" fill=\"#8B6CFF\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"53.0\" y=\"108.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">C 3</text><text x=\"53\" y=\"282\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Day 1</text><rect x=\"102\" y=\"185\" width=\"62\" height=\"75\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"133.0\" y=\"228.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">A 5</text><rect x=\"102\" y=\"125\" width=\"62\" height=\"60\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"133.0\" y=\"160.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">B 4</text><rect x=\"102\" y=\"80\" width=\"62\" height=\"45\" rx=\"8\" fill=\"#8B6CFF\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"133.0\" y=\"108.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">C 3</text><text x=\"133\" y=\"282\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Day 2</text><rect x=\"182\" y=\"185\" width=\"62\" height=\"75\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"213.0\" y=\"228.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">A 5</text><rect x=\"182\" y=\"125\" width=\"62\" height=\"60\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"213.0\" y=\"160.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">B 4</text><rect x=\"182\" y=\"80\" width=\"62\" height=\"45\" rx=\"8\" fill=\"#8B6CFF\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"213.0\" y=\"108.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">C 3</text><text x=\"213\" y=\"282\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Day 3</text><rect x=\"262\" y=\"185\" width=\"62\" height=\"75\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"293.0\" y=\"228.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">A 5</text><rect x=\"262\" y=\"125\" width=\"62\" height=\"60\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"293.0\" y=\"160.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">B 4</text><rect x=\"262\" y=\"80\" width=\"62\" height=\"45\" rx=\"8\" fill=\"#8B6CFF\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"293.0\" y=\"108.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">C 3</text><text x=\"293\" y=\"282\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Day 4</text><rect x=\"342\" y=\"185\" width=\"62\" height=\"75\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"373.0\" y=\"228.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">A 5</text><rect x=\"342\" y=\"125\" width=\"62\" height=\"60\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"373.0\" y=\"160.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">B 4</text><rect x=\"342\" y=\"80\" width=\"62\" height=\"45\" rx=\"8\" fill=\"#8B6CFF\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"373.0\" y=\"108.1\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">C 3</text><text x=\"373\" y=\"282\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Day 5</text><text x=\"240\" y=\"310\" font-size=\"16\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">5 days × 12 = 60 units = the whole job</text></svg>"]},{"id":"s3","title":"Leaving midway and pair rates","hi":"बीच में काम छोड़ना और जोड़ी की दरें","blocks":[{"t":"def","en":"If someone leaves midway: <b>(A's rate × A's days) + (B's rate × B's days) = 1 whole job.</b> Find the work done so far, subtract it, then divide what is left by the rate of whoever remains.","hi":"यदि कोई बीच में काम छोड़ दे: <b>(A की दर × A के दिन) + (B की दर × B के दिन) = 1 पूरा काम।</b> अब तक का काम निकालें, उसे घटाएँ, फिर बचे काम को बचे हुए व्यक्ति की दर से भाग दें।"},{"t":"card","title":"Worked example","en":"A takes 18 days and B takes 27 days. They work together for 6 days, then A leaves. How many more days does B need?<br><b>Step 1:</b> Total work = LCM(18, 27) = 54 units. A = 3/day, B = 2/day.<br><b>Step 2:</b> In 6 days together: 6 × 5 = 30 units.<br><b>Step 3:</b> Left = 54 − 30 = 24 units.<br><b>Answer: 24 ÷ 2 = 12 days.</b>","hi":"A को 18 दिन और B को 27 दिन लगते हैं। वे 6 दिन साथ काम करते हैं, फिर A छोड़ देता है। B को और कितने दिन चाहिए?<br><b>चरण 1:</b> कुल काम = LCM(18, 27) = 54 इकाई। A = 3/दिन, B = 2/दिन।<br><b>चरण 2:</b> 6 दिन साथ में: 6 × 5 = 30 इकाई।<br><b>चरण 3:</b> बचा = 54 − 30 = 24 इकाई।<br><b>उत्तर: 24 ÷ 2 = 12 दिन।</b>"},{"t":"sub","en":"Pair rates: A+B, B+C, C+A given","hi":"जोड़ी की दरें: A+B, B+C, C+A दी हों"},{"t":"p","en":"Add the three pair rates and divide by 2 to get A + B + C. Then subtract one pair to get the third person alone.","hi":"तीनों जोड़ियों की दरें जोड़कर 2 से भाग दें, इससे A + B + C मिलेगा। फिर एक जोड़ी घटाकर तीसरे व्यक्ति की दर निकालें।"},{"t":"card","title":"Worked example","en":"A+B finish in 12 days, B+C in 15 days, C+A in 20 days. Find A alone.<br><b>Step 1:</b> Total work = LCM(12, 15, 20) = 60. Pairs: A+B = 5, B+C = 4, C+A = 3 units/day.<br><b>Step 2:</b> 2(A+B+C) = 5 + 4 + 3 = 12, so A+B+C = 6/day (all three take 60 ÷ 6 = 10 days).<br><b>Step 3:</b> A = 6 − (B+C) = 6 − 4 = 2/day.<br><b>Answer: A alone = 60 ÷ 2 = 30 days.</b>","hi":"A+B 12 दिन में, B+C 15 दिन में, C+A 20 दिन में काम पूरा करते हैं। A अकेले का समय निकालें।<br><b>चरण 1:</b> कुल काम = LCM(12, 15, 20) = 60। जोड़ियाँ: A+B = 5, B+C = 4, C+A = 3 इकाई/दिन।<br><b>चरण 2:</b> 2(A+B+C) = 5 + 4 + 3 = 12, इसलिए A+B+C = 6/दिन (तीनों मिलकर 60 ÷ 6 = 10 दिन)।<br><b>चरण 3:</b> A = 6 − (B+C) = 6 − 4 = 2/दिन।<br><b>उत्तर: A अकेला = 60 ÷ 2 = 30 दिन।</b>"},{"t":"card","title":"Trap","en":"When a third worker C joins, find C by subtraction, never by adding days. A takes 16 days, B takes 24 days, and all three together take 8 days. LCM 48: A = 3, B = 2, all three = 6, so C = 6 − 5 = 1/day and C alone takes 48 days.","hi":"जब तीसरा मज़दूर C जुड़े, तो C की दर घटाकर निकालें, दिन जोड़कर नहीं। A को 16 दिन, B को 24 दिन और तीनों मिलकर 8 दिन लगते हैं। LCM 48: A = 3, B = 2, तीनों = 6, इसलिए C = 6 − 5 = 1/दिन और C अकेला 48 दिन लेगा।"}],"vis":["<svg viewBox=\"0 0 480 256\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"26\" font-size=\"17\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Total work = LCM(18, 24) = 72 units</text><rect x=\"16\" y=\"44\" width=\"261.3333333333333\" height=\"70\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"146.66666666666666\" y=\"74.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A + B: 6 days</text><text x=\"146.66666666666666\" y=\"94.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\">6 × 7 = 42 units</text><rect x=\"277.3333333333333\" y=\"44\" width=\"186.66666666666666\" height=\"70\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"370.66666666666663\" y=\"74.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B alone</text><text x=\"370.66666666666663\" y=\"94.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">30 ÷ 3 = 10 days</text><line x1=\"16\" y1=\"118\" x2=\"16\" y2=\"130\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"16\" y=\"150\" font-size=\"15\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">0</text><line x1=\"277.3333333333333\" y1=\"118\" x2=\"277.3333333333333\" y2=\"130\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"277.3333333333333\" y=\"150\" font-size=\"15\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">42</text><line x1=\"464\" y1=\"118\" x2=\"464\" y2=\"130\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"464\" y=\"150\" font-size=\"15\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">72</text><text x=\"240\" y=\"184\" font-size=\"16\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">A = 4 /day, B = 3 /day, together 7 /day</text><rect x=\"60\" y=\"198\" width=\"360\" height=\"44\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"225.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Left = 72 − 42 = 30 units = 5/12 of the job</text></svg>","<svg viewBox=\"0 0 480 284\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><rect x=\"8\" y=\"8\" width=\"148\" height=\"62\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"82.0\" y=\"34.6\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">A + B</text><text x=\"82.0\" y=\"54.6\" font-size=\"20\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">5 /day</text><line x1=\"82\" y1=\"72\" x2=\"240\" y2=\"100\" stroke=\"#D62839\" stroke-width=\"3\"/><polygon points=\"240,100 230.37467827778653,102.71167508080995 231.89267600869525,94.14583074211086\" fill=\"#D62839\"/><rect x=\"166\" y=\"8\" width=\"148\" height=\"62\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"34.6\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">B + C</text><text x=\"240.0\" y=\"54.6\" font-size=\"20\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">4 /day</text><line x1=\"240\" y1=\"72\" x2=\"240\" y2=\"100\" stroke=\"#D62839\" stroke-width=\"3\"/><polygon points=\"240,100 235.6503446588877,90.99552897647322 244.3496553411123,90.99552897647322\" fill=\"#D62839\"/><rect x=\"324\" y=\"8\" width=\"148\" height=\"62\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"398.0\" y=\"34.6\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">C + A</text><text x=\"398.0\" y=\"54.6\" font-size=\"20\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">3 /day</text><line x1=\"398\" y1=\"72\" x2=\"240\" y2=\"100\" stroke=\"#D62839\" stroke-width=\"3\"/><polygon points=\"240,100 248.10732399130475,94.14583074211086 249.62532172221347,102.71167508080995\" fill=\"#D62839\"/><rect x=\"60\" y=\"102\" width=\"360\" height=\"46\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"130.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Sum 12 ÷ 2 = 6 /day = A + B + C</text><line x1=\"240\" y1=\"150\" x2=\"82\" y2=\"176\" stroke=\"#D62839\" stroke-width=\"3\"/><polygon points=\"82,176 90.17870902037563,170.24598238097707 91.591243894102,178.82984815208357\" fill=\"#D62839\"/><rect x=\"8\" y=\"178\" width=\"148\" height=\"62\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"82.0\" y=\"204.6\" font-size=\"16\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">A = 6 − 4 = 2</text><text x=\"82.0\" y=\"224.6\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">B + C was 4</text><line x1=\"240\" y1=\"150\" x2=\"240\" y2=\"176\" stroke=\"#D62839\" stroke-width=\"3\"/><polygon points=\"240,176 235.6503446588877,166.99552897647322 244.3496553411123,166.99552897647322\" fill=\"#D62839\"/><rect x=\"166\" y=\"178\" width=\"148\" height=\"62\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"204.6\" font-size=\"16\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">B = 6 − 3 = 3</text><text x=\"240.0\" y=\"224.6\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">C + A was 3</text><line x1=\"240\" y1=\"150\" x2=\"398\" y2=\"176\" stroke=\"#D62839\" stroke-width=\"3\"/><polygon points=\"398,176 388.40875610589796,178.82984815208357 389.8212909796244,170.24598238097707\" fill=\"#D62839\"/><rect x=\"324\" y=\"178\" width=\"148\" height=\"62\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"398.0\" y=\"204.6\" font-size=\"16\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">C = 6 − 5 = 1</text><text x=\"398.0\" y=\"224.6\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">A + B was 5</text><text x=\"240\" y=\"270\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Alone: A = 60 ÷ 2 = 30 days (total work 60)</text></svg>"]},{"id":"s4","title":"Alternate days","hi":"एकांतर दिनों में काम","blocks":[{"t":"def","en":"On alternate days A works on day 1, B on day 2, A on day 3, and so on. Treat two days as <b>one cycle</b>: work per cycle = A's rate + B's rate.","hi":"एकांतर दिनों में A पहले दिन, B दूसरे दिन, A तीसरे दिन काम करता है, और इसी तरह आगे। दो दिन को <b>एक चक्र</b> मानें: एक चक्र का काम = A की दर + B की दर।"},{"t":"ul","items":[{"en":"Take the LCM as total work and find each rate.","hi":"LCM को कुल काम मानकर हर की दर निकालें।"},{"en":"Cycle work = A + B (it covers 2 days).","hi":"चक्र का काम = A + B (यह 2 दिन का होता है)।"},{"en":"Full cycles = total ÷ cycle work. Days = cycles × 2.","hi":"पूरे चक्र = कुल काम ÷ चक्र का काम। दिन = चक्र × 2।"},{"en":"If something is left over, see who works next and for how long.","hi":"कुछ बचे तो देखें कि अगला दिन किसका है और कितना समय लगेगा।"}]},{"t":"card","title":"Worked example","en":"A takes 10 days and B takes 15 days. They work on alternate days, A first. When is the job done?<br><b>Step 1:</b> LCM(10, 15) = 30 units. A = 3, B = 2.<br><b>Step 2:</b> One cycle (2 days) = 3 + 2 = 5 units.<br><b>Step 3:</b> 30 ÷ 5 = 6 full cycles, nothing left over.<br><b>Answer: 6 × 2 = 12 days.</b>","hi":"A को 10 दिन और B को 15 दिन लगते हैं। वे एकांतर दिनों में काम करते हैं, A पहले। काम कब पूरा होगा?<br><b>चरण 1:</b> LCM(10, 15) = 30 इकाई। A = 3, B = 2।<br><b>चरण 2:</b> एक चक्र (2 दिन) = 3 + 2 = 5 इकाई।<br><b>चरण 3:</b> 30 ÷ 5 = 6 पूरे चक्र, कुछ नहीं बचा।<br><b>उत्तर: 6 × 2 = 12 दिन।</b>"},{"t":"card","title":"Worked example","en":"A takes 12 days and B takes 18 days, A first, alternate days.<br><b>Step 1:</b> LCM(12, 18) = 36 units. A = 3, B = 2, cycle = 5 units.<br><b>Step 2:</b> 7 cycles = 14 days = 35 units. Left = 36 − 35 = 1 unit.<br><b>Step 3:</b> Day 15 is A's turn. A does 3 units/day, so 1 unit takes 1/3 day.<br><b>Answer: 14 1/3 days.</b>","hi":"A को 12 दिन और B को 18 दिन लगते हैं, A पहले, एकांतर दिन।<br><b>चरण 1:</b> LCM(12, 18) = 36 इकाई। A = 3, B = 2, चक्र = 5 इकाई।<br><b>चरण 2:</b> 7 चक्र = 14 दिन = 35 इकाई। बचा = 36 − 35 = 1 इकाई।<br><b>चरण 3:</b> दिन 15 A की बारी है। A प्रतिदिन 3 इकाई करता है, इसलिए 1 इकाई में 1/3 दिन लगेगा।<br><b>उत्तर: 14 1/3 दिन।</b>"},{"t":"card","title":"Trap","en":"The job can end in the middle of a cycle, so check the leftover. Same numbers, but if B had started, day 15 would be B's turn: 1 unit ÷ 2 per day = 1/2 day, giving 14 1/2 days. Who starts matters.","hi":"काम चक्र के बीच में भी पूरा हो सकता है, इसलिए बचे हुए काम को जाँचें। यही संख्याएँ हों पर B शुरू करे, तो दिन 15 B की बारी होगी: 1 इकाई ÷ 2 प्रतिदिन = 1/2 दिन, यानी 14 1/2 दिन। कौन शुरू करता है, यह मायने रखता है।"}],"vis":["<svg viewBox=\"0 0 480 318\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"24\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">A first: A = 3 units, B = 2 units, job = 36</text><text x=\"240\" y=\"56\" font-size=\"14\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Day</text><text x=\"27\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">1</text><rect x=\"12\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"27.0\" y=\"119.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A</text><text x=\"27\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">3</text><text x=\"57\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">2</text><rect x=\"42\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"57.0\" y=\"119.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B</text><text x=\"57\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">5</text><text x=\"87\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">3</text><rect x=\"72\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"87.0\" y=\"119.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A</text><text x=\"87\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">8</text><text x=\"117\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">4</text><rect x=\"102\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"117.0\" y=\"119.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B</text><text x=\"117\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">10</text><text x=\"147\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">5</text><rect x=\"132\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"147.0\" y=\"119.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A</text><text x=\"147\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">13</text><text x=\"177\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">6</text><rect x=\"162\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"177.0\" y=\"119.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B</text><text x=\"177\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">15</text><text x=\"207\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">7</text><rect x=\"192\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"207.0\" y=\"119.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A</text><text x=\"207\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">18</text><text x=\"237\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">8</text><rect x=\"222\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"237.0\" y=\"119.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B</text><text x=\"237\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">20</text><text x=\"267\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">9</text><rect x=\"252\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"267.0\" y=\"119.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A</text><text x=\"267\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">23</text><text x=\"297\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">10</text><rect x=\"282\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"297.0\" y=\"119.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B</text><text x=\"297\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">25</text><text x=\"327\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">11</text><rect x=\"312\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"327.0\" y=\"119.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A</text><text x=\"327\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">28</text><text x=\"357\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">12</text><rect x=\"342\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"357.0\" y=\"119.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B</text><text x=\"357\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">30</text><text x=\"387\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">13</text><rect x=\"372\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"387.0\" y=\"119.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A</text><text x=\"387\" y=\"168\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">33</text><text x=\"417\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">14</text><rect x=\"402\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"417.0\" y=\"119.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B</text><text x=\"417\" y=\"168\" font-size=\"14\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">35</text><text x=\"447\" y=\"80\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">15</text><rect x=\"432\" y=\"88\" width=\"30\" height=\"52\" rx=\"4\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2\" stroke-dasharray=\"6 5\"/><rect x=\"432\" y=\"88\" width=\"10\" height=\"52\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"447\" y=\"168\" font-size=\"14\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">36</text><text x=\"240\" y=\"196\" font-size=\"14\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Total so far</text><line x1=\"14\" y1=\"214\" x2=\"432\" y2=\"214\" stroke=\"#1D3FB8\" stroke-width=\"3\"/><line x1=\"14\" y1=\"208\" x2=\"14\" y2=\"220\" stroke=\"#1D3FB8\" stroke-width=\"3\"/><line x1=\"432\" y1=\"208\" x2=\"432\" y2=\"220\" stroke=\"#1D3FB8\" stroke-width=\"3\"/><text x=\"223\" y=\"238\" font-size=\"16\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">7 cycles = 14 days = 35 units</text><rect x=\"8\" y=\"252\" width=\"464\" height=\"56\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"275.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">Day 15 is A: 1 unit left, 1 ÷ 3 = 1/3 day</text><text x=\"240.0\" y=\"295.6\" font-size=\"17\" fill=\"#D62839\" font-weight=\"700\" text-anchor=\"middle\">Answer: 14 1/3 days</text></svg>"]},{"id":"s5","title":"Efficiency, men-days and chain rule","hi":"कार्यक्षमता, मैन-डेज़ और चेन रूल","blocks":[{"t":"table","long":false,"head":["Idea","Rule","Example"],"rows":[[{"en":"Efficiency and time","hi":"कार्यक्षमता और समय"},{"en":"Inversely proportional","hi":"व्युत्क्रमानुपाती"},{"en":"Double efficiency, half time","hi":"कार्यक्षमता दोगुनी, समय आधा"}],[{"en":"Efficiency up by x%: time falls by","hi":"कार्यक्षमता x% बढ़े: समय घटेगा"},{"en":"x/(100+x) × 100 %","hi":""},{"en":"25% → 20% less time","hi":"25% → 20% कम समय"}],[{"en":"Time down by y%: efficiency rises by","hi":"समय y% घटे: कार्यक्षमता बढ़ेगी"},{"en":"y/(100−y) × 100 %","hi":""},{"en":"20% → 25% more","hi":"20% → 25% अधिक"}],[{"en":"M men = W women (same work, same time)","hi":"M आदमी = W औरतें (समान काम, समान समय)"},{"en":"Man : Woman = W : M","hi":""},{"en":"4 men = 6 women → 3 : 2","hi":"4 आदमी = 6 औरतें → 3 : 2"}],[{"en":"Chain rule","hi":"चेन रूल"},{"en":"M1×D1×H1 / W1 = M2×D2×H2 / W2","hi":""},{"en":"men × days × hours ÷ work","hi":"आदमी × दिन × घंटे ÷ काम"}]]},{"t":"card","title":"Worked example","en":"12 men working 8 hours a day finish a job in 15 days. How many days will 18 men take, working 10 hours a day?<br><b>Step 1:</b> Same job, so 12 × 15 × 8 = 18 × D × 10.<br><b>Step 2:</b> 1440 = 180 × D.<br><b>Answer: D = 1440 ÷ 180 = 8 days.</b>","hi":"12 आदमी रोज़ 8 घंटे काम करके एक काम 15 दिन में पूरा करते हैं। 18 आदमी रोज़ 10 घंटे काम करें तो कितने दिन लगेंगे?<br><b>चरण 1:</b> काम समान है, इसलिए 12 × 15 × 8 = 18 × D × 10।<br><b>चरण 2:</b> 1440 = 180 × D।<br><b>उत्तर: D = 1440 ÷ 180 = 8 दिन।</b>"},{"t":"card","title":"Worked example","en":"8 men or 12 women can reap a field in 24 days. How long will 12 men and 6 women take together?<br><b>Step 1:</b> 8 men = 12 women, so 1 man = 1.5 women.<br><b>Step 2:</b> 12 men = 18 women. Add 6 women: 24 women in all.<br><b>Step 3:</b> 12 women take 24 days, so 24 women take half the time.<br><b>Answer: 12 days.</b>","hi":"8 आदमी या 12 औरतें एक खेत 24 दिन में काट सकती हैं। 12 आदमी और 6 औरतें साथ में कितने दिन लेंगे?<br><b>चरण 1:</b> 8 आदमी = 12 औरतें, इसलिए 1 आदमी = 1.5 औरतें।<br><b>चरण 2:</b> 12 आदमी = 18 औरतें। 6 औरतें जोड़ें: कुल 24 औरतें।<br><b>चरण 3:</b> 12 औरतें 24 दिन लेती हैं, तो 24 औरतें आधा समय लेंगी।<br><b>उत्तर: 12 दिन।</b>"},{"t":"card","title":"Worked example","en":"A takes 16 days. B is 60% more efficient than A. How long does B take?<br><b>Step 1:</b> Efficiency A : B = 100 : 160 = 5 : 8.<br><b>Step 2:</b> Total work = 16 × 5 = 80 units. B does 8 units/day.<br><b>Answer: 80 ÷ 8 = 10 days.</b>","hi":"A को 16 दिन लगते हैं। B, A से 60% अधिक कार्यक्षमता वाला है। B को कितने दिन लगेंगे?<br><b>चरण 1:</b> कार्यक्षमता A : B = 100 : 160 = 5 : 8।<br><b>चरण 2:</b> कुल काम = 16 × 5 = 80 इकाई। B प्रतिदिन 8 इकाई करता है।<br><b>उत्तर: 80 ÷ 8 = 10 दिन।</b>"},{"t":"card","title":"Trap","en":"If efficiency rises by 25%, time falls by 20%, not 25%. The percentage change is always on the original base, so the two percentages are never equal.","hi":"कार्यक्षमता 25% बढ़े तो समय 20% घटता है, 25% नहीं। प्रतिशत बदलाव हमेशा मूल मान पर निकलता है, इसलिए दोनों प्रतिशत कभी बराबर नहीं होते।"}],"vis":["<svg viewBox=\"0 0 480 290\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"22\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Efficiency per day (units)</text><rect x=\"12\" y=\"32\" width=\"150\" height=\"36\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"87.0\" y=\"55.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A = 5</text><rect x=\"12\" y=\"74\" width=\"240\" height=\"36\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"132.0\" y=\"97.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B = 8</text><text x=\"240\" y=\"140\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Days needed for 80 units</text><rect x=\"12\" y=\"150\" width=\"320\" height=\"36\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"172.0\" y=\"173.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A: 16 days</text><rect x=\"12\" y=\"192\" width=\"200\" height=\"36\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"112.0\" y=\"215.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B: 10 days</text><rect x=\"8\" y=\"240\" width=\"464\" height=\"40\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"265.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Efficiency 5 : 8, time 16 : 10 = 8 : 5</text></svg>","<svg viewBox=\"0 0 480 242\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><rect x=\"8\" y=\"8\" width=\"464\" height=\"56\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"31.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">12 men × 15 days × 8 h</text><text x=\"240.0\" y=\"51.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">= 1440 man-hours</text><text x=\"240\" y=\"86\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">= same job =</text><rect x=\"8\" y=\"98\" width=\"464\" height=\"56\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"121.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">18 men × D days × 10 h</text><text x=\"240.0\" y=\"141.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\">= 180 × D</text><line x1=\"240\" y1=\"156\" x2=\"240\" y2=\"180\" stroke=\"#D62839\" stroke-width=\"3.5\"/><polygon points=\"240,180 235.6503446588877,170.99552897647322 244.3496553411123,170.99552897647322\" fill=\"#D62839\"/><rect x=\"8\" y=\"182\" width=\"464\" height=\"50\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"213.3\" font-size=\"18\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">D = 1440 ÷ 180 = 8 days</text></svg>"]},{"id":"s6","title":"Wages","hi":"मज़दूरी का बँटवारा","blocks":[{"t":"def","en":"Wages are shared in the ratio of <b>work done = efficiency × days worked</b>, not in the ratio of days alone.","hi":"मज़दूरी <b>किए गए काम = कार्यक्षमता × काम के दिन</b> के अनुपात में बँटती है, केवल दिनों के अनुपात में नहीं।"},{"t":"table","long":false,"head":["Case","Wage ratio"],"rows":[[{"en":"Same number of days worked","hi":"काम के दिन समान"},{"en":"Efficiency ratio (inverse of days needed alone)","hi":"कार्यक्षमता का अनुपात (अकेले लगने वाले दिनों का व्युत्क्रम)"}],[{"en":"Different days worked","hi":"काम के दिन अलग-अलग"},{"en":"Efficiency × days for each","hi":"हर एक का कार्यक्षमता × दिन"}],[{"en":"Same efficiency","hi":"कार्यक्षमता समान"},{"en":"Ratio of days worked","hi":"काम के दिनों का अनुपात"}]]},{"t":"card","title":"Worked example","en":"A alone takes 6 days, B alone takes 12 days. They work together for the same time and share ₹900. Find each share.<br><b>Step 1:</b> LCM(6, 12) = 12. A = 2/day, B = 1/day, so ratio 2 : 1.<br><b>Step 2:</b> 3 parts = ₹900, so 1 part = ₹300.<br><b>Answer: A gets ₹600 and B gets ₹300.</b>","hi":"A अकेला 6 दिन और B अकेला 12 दिन लेता है। वे समान समय साथ काम करके ₹900 बाँटते हैं। हर एक का हिस्सा निकालें।<br><b>चरण 1:</b> LCM(6, 12) = 12। A = 2/दिन, B = 1/दिन, अनुपात 2 : 1।<br><b>चरण 2:</b> 3 भाग = ₹900, इसलिए 1 भाग = ₹300।<br><b>उत्तर: A को ₹600 और B को ₹300।</b>"},{"t":"card","title":"Worked example","en":"A alone takes 20 days and B alone takes 30 days. On one job A worked 5 days and B worked 9 days. Total pay is ₹2,200.<br><b>Step 1:</b> LCM = 60. A = 3/day, B = 2/day.<br><b>Step 2:</b> Work done: A = 3 × 5 = 15, B = 2 × 9 = 18. Ratio 15 : 18 = 5 : 6.<br><b>Step 3:</b> 11 parts = ₹2,200, so 1 part = ₹200.<br><b>Answer: A gets ₹1,000 and B gets ₹1,200.</b>","hi":"A अकेला 20 दिन और B अकेला 30 दिन लेता है। एक काम में A ने 5 दिन और B ने 9 दिन काम किया। कुल मज़दूरी ₹2,200 है।<br><b>चरण 1:</b> LCM = 60। A = 3/दिन, B = 2/दिन।<br><b>चरण 2:</b> किया गया काम: A = 3 × 5 = 15, B = 2 × 9 = 18। अनुपात 15 : 18 = 5 : 6।<br><b>चरण 3:</b> 11 भाग = ₹2,200, इसलिए 1 भाग = ₹200।<br><b>उत्तर: A को ₹1,000 और B को ₹1,200।</b>"},{"t":"card","title":"Trap","en":"Working the same number of days does not mean equal pay. The faster worker did more work and is paid more. Only the same <i>work</i>, never the same days, means the same pay.","hi":"समान दिन काम करने का मतलब बराबर मज़दूरी नहीं है। तेज़ मज़दूर ने ज़्यादा काम किया है, इसलिए उसे ज़्यादा मिलता है। बराबर <i>काम</i> पर ही बराबर मज़दूरी मिलती है, बराबर दिनों पर नहीं।"}],"vis":["<svg viewBox=\"0 0 480 290\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"24\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Same time: share ₹900 in ratio 2 : 1</text><rect x=\"16\" y=\"36\" width=\"298.6666666666667\" height=\"56\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"165.33333333333334\" y=\"69.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A  ₹600</text><rect x=\"314.6666666666667\" y=\"36\" width=\"149.33333333333334\" height=\"56\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"389.33333333333337\" y=\"69.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B  ₹300</text><text x=\"240\" y=\"126\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Work done: A 3 × 5 = 15, B 2 × 9 = 18</text><text x=\"240\" y=\"148\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Share ₹2,200 in ratio 15 : 18 = 5 : 6</text><rect x=\"16\" y=\"160\" width=\"203.63636363636365\" height=\"56\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"117.81818181818183\" y=\"193.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">A  ₹1,000</text><rect x=\"219.63636363636365\" y=\"160\" width=\"244.36363636363637\" height=\"56\" rx=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"341.81818181818187\" y=\"193.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">B  ₹1,200</text><rect x=\"8\" y=\"236\" width=\"464\" height=\"44\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"263.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Wage ratio = efficiency × days worked</text></svg>"]},{"id":"s7","title":"Pipes and cisterns","hi":"पाइप और टंकी","blocks":[{"t":"def","en":"An <b>inlet</b> fills the tank (positive work). An <b>outlet</b> or a leak empties it (negative work). <b>Net rate = inlet rates − outlet rates.</b> Volume = rate × time.","hi":"<b>इनलेट</b> टंकी भरता है (धनात्मक काम)। <b>आउटलेट</b> या रिसाव उसे खाली करता है (ऋणात्मक काम)। <b>नेट दर = इनलेट की दरें − आउटलेट की दरें।</b> आयतन = दर × समय।"},{"t":"table","long":false,"head":["Case","Time to fill","Example"],"rows":[[{"en":"Two inlets, a and b hours","hi":"दो इनलेट, a और b घंटे"},{"en":"ab/(a+b)","hi":""},{"en":"12, 15 → 180/27 = 6 h 40 min","hi":"12, 15 → 180/27 = 6 घंटे 40 मिनट"}],[{"en":"Inlet a, outlet b (b > a)","hi":"इनलेट a, आउटलेट b (b > a)"},{"en":"ab/(b−a)","hi":""},{"en":"6, 8 → 48/2 = 24 h","hi":"6, 8 → 48/2 = 24 घंटे"}],[{"en":"Fills in a h; with leak b h: leak alone empties in","hi":"a घंटे में भरता है; रिसाव के साथ b घंटे: रिसाव अकेला खाली करेगा"},{"en":"ab/(b−a)","hi":""},{"en":"8, 10 → 80/2 = 40 h","hi":"8, 10 → 80/2 = 40 घंटे"}],[{"en":"Inlet and outlet take equal time","hi":"इनलेट और आउटलेट समान समय लेते हैं"},{"en":"Net rate 0: never fills","hi":"नेट दर 0: कभी नहीं भरती"},{"en":"x h and x h","hi":"x घंटे और x घंटे"}]]},{"t":"card","title":"Worked example","en":"Pipes P and Q fill a tank in 15 h and 20 h. Pipe R empties it in 30 h. All three are open. When is the tank full?<br><b>Step 1:</b> Capacity = LCM(15, 20, 30) = 60 units.<br><b>Step 2:</b> P = +4, Q = +3, R = −2 units/h.<br><b>Step 3:</b> Net = 4 + 3 − 2 = 5 units/h.<br><b>Answer: 60 ÷ 5 = 12 hours.</b>","hi":"पाइप P और Q टंकी को 15 घंटे और 20 घंटे में भरते हैं। पाइप R उसे 30 घंटे में खाली करता है। तीनों खुले हैं। टंकी कब भरेगी?<br><b>चरण 1:</b> क्षमता = LCM(15, 20, 30) = 60 इकाई।<br><b>चरण 2:</b> P = +4, Q = +3, R = −2 इकाई/घंटा।<br><b>चरण 3:</b> नेट = 4 + 3 − 2 = 5 इकाई/घंटा।<br><b>उत्तर: 60 ÷ 5 = 12 घंटे।</b>"},{"t":"card","title":"Worked example","en":"A pipe fills a tank in 12 h. Because of a leak it takes 15 h. How long does the leak alone take to empty the full tank?<br><b>Step 1:</b> Capacity = LCM(12, 15) = 60 units.<br><b>Step 2:</b> Inlet = +5/h. With the leak, net = 60 ÷ 15 = +4/h.<br><b>Step 3:</b> Leak = 5 − 4 = 1 unit/h.<br><b>Answer: 60 ÷ 1 = 60 hours.</b>","hi":"एक पाइप टंकी को 12 घंटे में भरता है। रिसाव के कारण 15 घंटे लगते हैं। रिसाव अकेला भरी टंकी को कितने घंटे में खाली करेगा?<br><b>चरण 1:</b> क्षमता = LCM(12, 15) = 60 इकाई।<br><b>चरण 2:</b> इनलेट = +5/घंटा। रिसाव के साथ नेट = 60 ÷ 15 = +4/घंटा।<br><b>चरण 3:</b> रिसाव = 5 − 4 = 1 इकाई/घंटा।<br><b>उत्तर: 60 ÷ 1 = 60 घंटे।</b>"},{"t":"ul","items":[{"en":"Pipe A fills in a h, B in b h: A is b/a times faster. Pipes of 30 min and 20 min deliver water in the ratio 1/30 : 1/20 = 2 : 3.","hi":"पाइप A, a घंटे में और B, b घंटे में भरता है: A, b/a गुना तेज़ है। 30 मिनट और 20 मिनट वाले पाइप 1/30 : 1/20 = 2 : 3 के अनुपात में पानी देते हैं।"},{"en":"Time to fill a fraction f of the tank = f × (time for the full tank): 3/4 of a 20-min tank takes 15 min.","hi":"टंकी का भाग f भरने का समय = f × (पूरी टंकी का समय): 20 मिनट वाली टंकी का 3/4 भरने में 15 मिनट।"},{"en":"Volume = rate × time: 40 L/min for 15 min = 600 L.","hi":"आयतन = दर × समय: 40 लीटर/मिनट × 15 मिनट = 600 लीटर।"}]},{"t":"card","title":"Trap","en":"A leak makes filling slower. Find its rate as inlet rate − net rate. Never subtract the times: 15 − 12 = 3 is wrong, the leak needs 60 hours.","hi":"रिसाव से भरना धीमा हो जाता है। उसकी दर = इनलेट की दर − नेट दर। समयों को कभी न घटाएँ: 15 − 12 = 3 ग़लत है, रिसाव को 60 घंटे लगते हैं।"}],"vis":["<svg viewBox=\"0 0 480 340\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><rect x=\"150\" y=\"50\" width=\"180\" height=\"170\" rx=\"6\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"3\"/><rect x=\"153\" y=\"120\" width=\"174\" height=\"97\" rx=\"3\" fill=\"#FFE14D\" stroke=\"#FFE14D\" stroke-width=\"1\"/><text x=\"240\" y=\"104\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">Capacity</text><text x=\"240\" y=\"172\" font-size=\"20\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">60 units</text><line x1=\"12\" y1=\"90\" x2=\"148\" y2=\"90\" stroke=\"#1D3FB8\" stroke-width=\"4\"/><polygon points=\"148,90 138.99552897647322,94.3496553411123 138.99552897647322,85.6503446588877\" fill=\"#1D3FB8\"/><text x=\"80\" y=\"78\" font-size=\"16\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">P  +4 /h</text><line x1=\"12\" y1=\"140\" x2=\"148\" y2=\"140\" stroke=\"#1D3FB8\" stroke-width=\"4\"/><polygon points=\"148,140 138.99552897647322,144.3496553411123 138.99552897647322,135.6503446588877\" fill=\"#1D3FB8\"/><text x=\"80\" y=\"128\" font-size=\"16\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">Q  +3 /h</text><line x1=\"332\" y1=\"196\" x2=\"468\" y2=\"196\" stroke=\"#D62839\" stroke-width=\"4\"/><polygon points=\"468,196 458.9955289764732,200.3496553411123 458.9955289764732,191.6503446588877\" fill=\"#D62839\"/><text x=\"400\" y=\"184\" font-size=\"16\" fill=\"#D62839\" font-weight=\"700\" text-anchor=\"middle\">R  −2 /h</text><rect x=\"8\" y=\"238\" width=\"464\" height=\"40\" rx=\"8\" fill=\"#fff\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"263.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Net = 4 + 3 − 2 = 5 units per hour</text><rect x=\"8\" y=\"286\" width=\"464\" height=\"44\" rx=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"314.3\" font-size=\"18\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">60 ÷ 5 = 12 hours</text></svg>","<svg viewBox=\"0 0 480 268\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"24\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Units per hour (capacity 60)</text><line x1=\"20\" y1=\"232\" x2=\"460\" y2=\"232\" stroke=\"#26262E\" stroke-width=\"3\"/><rect x=\"30\" y=\"152\" width=\"80\" height=\"80\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"70.0\" y=\"197.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">+4</text><rect x=\"135\" y=\"92\" width=\"80\" height=\"60\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"175.0\" y=\"127.6\" font-size=\"16\" fill=\"#fff\" text-anchor=\"middle\" font-weight=\"700\">+3</text><rect x=\"240\" y=\"92\" width=\"80\" height=\"40\" rx=\"4\" fill=\"#FFFCF2\" stroke=\"#D62839\" stroke-width=\"2.5\"/><text x=\"280.0\" y=\"117.6\" font-size=\"16\" fill=\"#D62839\" text-anchor=\"middle\" font-weight=\"700\">−2</text><rect x=\"345\" y=\"132\" width=\"80\" height=\"100\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"385.0\" y=\"187.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">= 5</text><text x=\"70\" y=\"256\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">P</text><text x=\"175\" y=\"256\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Q</text><text x=\"280\" y=\"256\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">R</text><text x=\"385\" y=\"256\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Net</text></svg>"]},{"id":"s8","title":"Pipes: closing, timing and alternating","hi":"पाइप: बंद करना, समय और बारी-बारी","blocks":[{"t":"ul","items":[{"en":"Work out the units filled in the time all pipes ran together, then subtract from capacity.","hi":"जितने समय सब पाइप साथ चले, उतनी इकाई निकालें, फिर क्षमता में से घटाएँ।"},{"en":"If a pipe is closed, the rest must fill what is left at their own rate.","hi":"कोई पाइप बंद हो जाए, तो बचा हुआ भाग बाकी पाइप अपनी दर से भरते हैं।"},{"en":"If a pipe stays open all the time, multiply its rate by the full time.","hi":"कोई पाइप पूरे समय खुला रहे, तो उसकी दर को पूरे समय से गुणा करें।"},{"en":"Pipes opened in turn: find the units per cycle, count full cycles, then check the last step.","hi":"पाइप बारी-बारी से खुलें: एक चक्र की इकाई निकालें, पूरे चक्र गिनें, फिर अंतिम चरण जाँचें।"}]},{"t":"card","title":"Worked example","en":"A fills a tank in 6 h, B in 8 h. Both open for 2 h, then A is closed. How much longer does B need?<br><b>Step 1:</b> Capacity = LCM(6, 8) = 24 units. A = 4/h, B = 3/h.<br><b>Step 2:</b> In 2 h: 2 × 7 = 14 units. Left = 24 − 14 = 10 units.<br><b>Answer: 10 ÷ 3 = 3 1/3 h = 3 h 20 min.</b>","hi":"A टंकी को 6 घंटे में और B 8 घंटे में भरता है। दोनों 2 घंटे खुले रहते हैं, फिर A बंद हो जाता है। B को और कितना समय चाहिए?<br><b>चरण 1:</b> क्षमता = LCM(6, 8) = 24 इकाई। A = 4/घंटा, B = 3/घंटा।<br><b>चरण 2:</b> 2 घंटे में: 2 × 7 = 14 इकाई। बचा = 24 − 14 = 10 इकाई।<br><b>उत्तर: 10 ÷ 3 = 3 1/3 घंटे = 3 घंटे 20 मिनट।</b>"},{"t":"card","title":"Worked example","en":"A fills in 16 min, B in 24 min. After how many minutes should B be closed so that the tank is full in 12 min in all?<br><b>Step 1:</b> Capacity = LCM(16, 24) = 48. A = 3/min, B = 2/min.<br><b>Step 2:</b> A runs all 12 min: 12 × 3 = 36 units. Left for B = 48 − 36 = 12 units.<br><b>Answer: B runs 12 ÷ 2 = 6 minutes.</b>","hi":"A 16 मिनट में और B 24 मिनट में टंकी भरता है। कुल 12 मिनट में टंकी भरने के लिए B को कितने मिनट बाद बंद करना होगा?<br><b>चरण 1:</b> क्षमता = LCM(16, 24) = 48। A = 3/मिनट, B = 2/मिनट।<br><b>चरण 2:</b> A पूरे 12 मिनट चलता है: 12 × 3 = 36 इकाई। B के लिए बचा = 48 − 36 = 12 इकाई।<br><b>उत्तर: B 12 ÷ 2 = 6 मिनट चलेगा।</b>"},{"t":"card","title":"Worked example","en":"A, B, C fill a tank in 10, 12, 15 h. A stays open. B and C are opened alternately for 1 h each, B first.<br><b>Step 1:</b> Capacity = 60. A = 6, B = 5, C = 4 units/h.<br><b>Step 2:</b> Hour 1 (A+B) = 11, hour 2 (A+C) = 10. Cycle = 21 units in 2 h.<br><b>Step 3:</b> 2 cycles = 4 h = 42 units. Hour 5 (A+B) adds 11: 53 units. Left = 7.<br><b>Step 4:</b> Hour 6 (A+C) runs at 10/h, so 7 units take 7/10 h.<br><b>Answer: 5 7/10 hours.</b>","hi":"A, B, C टंकी को 10, 12, 15 घंटे में भरते हैं। A खुला रहता है। B और C बारी-बारी से 1-1 घंटे खुलते हैं, पहले B।<br><b>चरण 1:</b> क्षमता = 60। A = 6, B = 5, C = 4 इकाई/घंटा।<br><b>चरण 2:</b> घंटा 1 (A+B) = 11, घंटा 2 (A+C) = 10। चक्र = 2 घंटे में 21 इकाई।<br><b>चरण 3:</b> 2 चक्र = 4 घंटे = 42 इकाई। घंटा 5 (A+B) से 11 जुड़े: 53 इकाई। बचा = 7।<br><b>चरण 4:</b> घंटा 6 (A+C) की दर 10/घंटा है, इसलिए 7 इकाई में 7/10 घंटा।<br><b>उत्तर: 5 7/10 घंटे।</b>"},{"t":"card","title":"Trap","en":"Alternating inlet and outlet: do not just multiply cycles. Inlet fills in 20 min, outlet empties in 30 min, 1 min each, inlet first. Capacity 60, inlet +3, outlet −2, net +1 per 2 min. After 57 cycles (114 min) the level is 57. The next minute the inlet adds 3 and the tank is full at <b>115 min</b>, not 120.","hi":"बारी-बारी से इनलेट और आउटलेट: सिर्फ़ चक्र × समय न निकालें। इनलेट 20 मिनट में भरता है, आउटलेट 30 मिनट में खाली करता है, 1-1 मिनट, पहले इनलेट। क्षमता 60, इनलेट +3, आउटलेट −2, नेट +1 प्रति 2 मिनट। 57 चक्र (114 मिनट) बाद स्तर 57 है। अगले मिनट इनलेट 3 जोड़ता है और टंकी <b>115 मिनट</b> में भर जाती है, 120 में नहीं।"}],"vis":["<svg viewBox=\"0 0 480 288\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"22\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Level (units) against time (hours)</text><line x1=\"40\" y1=\"230\" x2=\"40\" y2=\"42.0\" stroke=\"#26262E\" stroke-width=\"2.5\"/><line x1=\"40\" y1=\"230\" x2=\"452\" y2=\"230\" stroke=\"#26262E\" stroke-width=\"2.5\"/><line x1=\"40\" y1=\"50.0\" x2=\"452\" y2=\"50.0\" stroke=\"#26262E\" stroke-width=\"2\" stroke-dasharray=\"6 5\"/><text x=\"46\" y=\"42.0\" font-size=\"14\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"start\">full = 24</text><text x=\"40.0\" y=\"250\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">0</text><text x=\"106.66666666666667\" y=\"250\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">1</text><text x=\"173.33333333333334\" y=\"250\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">2</text><text x=\"240.0\" y=\"250\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">3</text><text x=\"306.6666666666667\" y=\"250\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">4</text><text x=\"373.33333333333337\" y=\"250\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">5</text><text x=\"440.0\" y=\"250\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">6</text><text x=\"246\" y=\"272\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">hours</text><polyline points=\"40.0,230.0 173.33333333333334,125.0 395.5555555555556,50.0\" fill=\"none\" stroke=\"#1D3FB8\" stroke-width=\"4\" stroke-linejoin=\"round\"/><circle cx=\"173.3\" cy=\"125.0\" r=\"8\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><circle cx=\"395.6\" cy=\"50.0\" r=\"8\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"62\" y=\"105.0\" font-size=\"15\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"start\">A + B: 7 /h</text><text x=\"187.33333333333334\" y=\"155.0\" font-size=\"15\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"start\">A closed: 14 units</text><text x=\"300.0\" y=\"105.0\" font-size=\"15\" fill=\"#1D3FB8\" font-weight=\"700\" text-anchor=\"middle\">B alone: 3 /h</text></svg>","<svg viewBox=\"0 0 480 332\" xmlns=\"http://www.w3.org/2000/svg\" font-family=\"Hind, sans-serif\" role=\"img\"><text x=\"240\" y=\"22\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">Level after each minute (capacity 60)</text><line x1=\"14\" y1=\"190\" x2=\"466\" y2=\"190\" stroke=\"#26262E\" stroke-width=\"2.5\"/><rect x=\"22\" y=\"136\" width=\"44\" height=\"54\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"44.0\" y=\"168.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"44\" y=\"128\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">3</text><text x=\"44\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">1</text><rect x=\"77\" y=\"172\" width=\"44\" height=\"18\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"99.0\" y=\"186.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"99\" y=\"164\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">1</text><text x=\"99\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">2</text><rect x=\"132\" y=\"118\" width=\"44\" height=\"72\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"154.0\" y=\"159.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"154\" y=\"110\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">4</text><text x=\"154\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">3</text><rect x=\"187\" y=\"154\" width=\"44\" height=\"36\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"209.0\" y=\"177.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"209\" y=\"146\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">2</text><text x=\"209\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">4</text><rect x=\"242\" y=\"100\" width=\"44\" height=\"90\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"264.0\" y=\"150.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"264\" y=\"92\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">5</text><text x=\"264\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">5</text><rect x=\"297\" y=\"136\" width=\"44\" height=\"54\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"319.0\" y=\"168.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"319\" y=\"128\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">3</text><text x=\"319\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">6</text><rect x=\"352\" y=\"82\" width=\"44\" height=\"108\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"374.0\" y=\"141.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"374\" y=\"74\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">6</text><text x=\"374\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">7</text><rect x=\"407\" y=\"118\" width=\"44\" height=\"72\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"429.0\" y=\"159.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\"></text><text x=\"429\" y=\"110\" font-size=\"16\" fill=\"#26262E\" font-weight=\"700\" text-anchor=\"middle\">4</text><text x=\"429\" y=\"210\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">8</text><text x=\"240\" y=\"232\" font-size=\"14\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"middle\">minute</text><rect x=\"30\" y=\"246\" width=\"24\" height=\"18\" rx=\"4\" fill=\"#1D3FB8\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"62\" y=\"261\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"start\">inlet +3</text><rect x=\"170\" y=\"246\" width=\"24\" height=\"18\" rx=\"4\" fill=\"#FFE14D\" stroke=\"#26262E\" stroke-width=\"2\"/><text x=\"202\" y=\"261\" font-size=\"15\" fill=\"#26262E\" font-weight=\"400\" text-anchor=\"start\">outlet −2</text><rect x=\"8\" y=\"278\" width=\"464\" height=\"44\" rx=\"8\" fill=\"#FFFCF2\" stroke=\"#26262E\" stroke-width=\"2.5\"/><text x=\"240.0\" y=\"305.6\" font-size=\"16\" fill=\"#26262E\" text-anchor=\"middle\" font-weight=\"700\">Net +1 per 2 min: 57 after 114 min, full at 115</text></svg>"]}],"questions":[{"q":"A can complete 1/3 of a work in 5 days, and B can complete 2/5 of the same work in 10 days. In how many days can A and B together complete the whole work?","qhi":"A किसी काम का 1/3 भाग 5 दिन में कर सकता है और B उसी काम का 2/5 भाग 10 दिन में कर सकता है। A और B मिलकर पूरा काम कितने दिन में कर सकते हैं?","opts":[{"en":"9 days","hi":"9 दिन"},{"en":"10 days","hi":"10 दिन"},{"en":"8 1/2 days","hi":"8 1/2 दिन"},{"en":"9 3/8 days","hi":"9 3/8 दिन"}],"ans":"D","exp":"A alone takes 5 ÷ 1/3 = 15 days and B alone takes 10 ÷ 2/5 = 25 days. LCM = 75: A = 5/day, B = 3/day, together 8/day. Time = 75 ÷ 8 = 9 3/8 days.","exphi":"A अकेला 5 ÷ 1/3 = 15 दिन और B अकेला 10 ÷ 2/5 = 25 दिन लेता है। LCM = 75: A = 5/दिन, B = 3/दिन, साथ में 8/दिन। समय = 75 ÷ 8 = 9 3/8 दिन।","src":"bank","sec":"s1","id":"n1"},{"q":"A and B together can finish a work in 12 days. A alone can finish it in 20 days. In how many days can B alone finish it?","qhi":"A और B मिलकर एक काम 12 दिन में पूरा कर सकते हैं। A अकेला उसे 20 दिन में पूरा कर सकता है। B अकेला उसे कितने दिन में पूरा करेगा?","opts":[{"en":"8 days","hi":"8 दिन"},{"en":"36 days","hi":"36 दिन"},{"en":"30 days","hi":"30 दिन"},{"en":"32 days","hi":"32 दिन"}],"ans":"C","exp":"Total work = LCM(12, 20) = 60 units. A + B = 5/day and A = 3/day, so B = 2/day. B alone takes 60 ÷ 2 = 30 days.","exphi":"कुल काम = LCM(12, 20) = 60 इकाई। A + B = 5/दिन और A = 3/दिन, इसलिए B = 2/दिन। B अकेला 60 ÷ 2 = 30 दिन लेगा।","src":"note","sec":"s2","id":"n2"},{"q":"A can complete a work in 18 days and B in 24 days. They work together for 6 days, and then A leaves. In how many more days will B finish the remaining work?","qhi":"A एक काम को 18 दिन में और B 24 दिन में पूरा कर सकता है। वे 6 दिन साथ काम करते हैं, फिर A चला जाता है। B शेष काम को और कितने दिन में पूरा करेगा?","opts":[{"en":"10 days","hi":"10 दिन"},{"en":"8 days","hi":"8 दिन"},{"en":"9 days","hi":"9 दिन"},{"en":"12 days","hi":"12 दिन"}],"ans":"A","exp":"Total work = LCM(18, 24) = 72 units. A = 4/day, B = 3/day. In 6 days: 6 × 7 = 42 units. Left = 72 − 42 = 30 units. B needs 30 ÷ 3 = 10 days.","exphi":"कुल काम = LCM(18, 24) = 72 इकाई। A = 4/दिन, B = 3/दिन। 6 दिन में: 6 × 7 = 42 इकाई। बचा = 72 − 42 = 30 इकाई। B को 30 ÷ 3 = 10 दिन लगेंगे।","src":"bank","sec":"s3","id":"n3"},{"q":"A and B together can complete a work in 12 days, B and C together in 15 days, and C and A together in 20 days. In how many days can A alone complete the work?","qhi":"A और B मिलकर एक काम 12 दिन में, B और C मिलकर 15 दिन में तथा C और A मिलकर 20 दिन में पूरा कर सकते हैं। A अकेला काम कितने दिन में पूरा करेगा?","opts":[{"en":"20 days","hi":"20 दिन"},{"en":"30 days","hi":"30 दिन"},{"en":"25 days","hi":"25 दिन"},{"en":"35 days","hi":"35 दिन"}],"ans":"B","exp":"Total work = LCM(12, 15, 20) = 60. Pairs: 5, 4, 3 per day. 2(A+B+C) = 12, so A+B+C = 6. A = 6 − (B+C) = 6 − 4 = 2/day. A alone takes 60 ÷ 2 = 30 days.","exphi":"कुल काम = LCM(12, 15, 20) = 60। जोड़ियाँ: 5, 4, 3 प्रतिदिन। 2(A+B+C) = 12, इसलिए A+B+C = 6। A = 6 − (B+C) = 6 − 4 = 2/दिन। A अकेला 60 ÷ 2 = 30 दिन लेगा।","src":"bank","sec":"s3","id":"n4"},{"q":"A can complete a work in 12 days and B in 18 days. They work on alternate days, starting with A on the first day. In how many days will the work be completed?","qhi":"A एक काम को 12 दिन में और B 18 दिन में पूरा कर सकता है। वे एकांतर दिनों में काम करते हैं और पहले दिन A शुरू करता है। काम कितने दिन में पूरा होगा?","opts":[{"en":"15 days","hi":"15 दिन"},{"en":"14 1/2 days","hi":"14 1/2 दिन"},{"en":"14 1/3 days","hi":"14 1/3 दिन"},{"en":"13 2/3 days","hi":"13 2/3 दिन"}],"ans":"C","exp":"Total work = LCM(12, 18) = 36. A = 3, B = 2, cycle = 5 units. 7 cycles = 14 days = 35 units. Left = 1 unit, done by A on day 15 in 1/3 day. Total 14 1/3 days.","exphi":"कुल काम = LCM(12, 18) = 36। A = 3, B = 2, चक्र = 5 इकाई। 7 चक्र = 14 दिन = 35 इकाई। बचा = 1 इकाई, जो A दिन 15 में 1/3 दिन में करता है। कुल 14 1/3 दिन।","src":"bank","sec":"s4","id":"n5"},{"q":"12 men working 8 hours a day can finish a project in 15 days. In how many days can 18 men finish it working 10 hours a day?","qhi":"12 आदमी रोज़ 8 घंटे काम करके एक परियोजना 15 दिन में पूरी कर सकते हैं। 18 आदमी रोज़ 10 घंटे काम करें तो कितने दिन में पूरी होगी?","opts":[{"en":"6 days","hi":"6 दिन"},{"en":"8 days","hi":"8 दिन"},{"en":"9 days","hi":"9 दिन"},{"en":"10 days","hi":"10 दिन"}],"ans":"B","exp":"M1 × D1 × H1 = M2 × D2 × H2: 12 × 15 × 8 = 18 × D × 10. So 1440 = 180 × D and D = 8 days.","exphi":"M1 × D1 × H1 = M2 × D2 × H2: 12 × 15 × 8 = 18 × D × 10। इसलिए 1440 = 180 × D और D = 8 दिन।","src":"bank","sec":"s5","id":"n6"},{"q":"A can complete a project in 16 days. B is 60% more efficient than A. In how many days can B alone complete the project?","qhi":"A एक परियोजना को 16 दिन में पूरा कर सकता है। B, A से 60% अधिक कुशल है। B अकेला परियोजना कितने दिन में पूरी करेगा?","opts":[{"en":"10 days","hi":"10 दिन"},{"en":"12 days","hi":"12 दिन"},{"en":"8 days","hi":"8 दिन"},{"en":"9 days","hi":"9 दिन"}],"ans":"A","exp":"Efficiency A : B = 100 : 160 = 5 : 8. Total work = 16 × 5 = 80 units. B does 8 units/day, so B takes 80 ÷ 8 = 10 days.","exphi":"कार्यक्षमता A : B = 100 : 160 = 5 : 8। कुल काम = 16 × 5 = 80 इकाई। B प्रतिदिन 8 इकाई करता है, इसलिए B को 80 ÷ 8 = 10 दिन लगेंगे।","src":"bank","sec":"s5","id":"n7"},{"q":"A can finish a job in 12 days and B in 18 days. They work together and are paid ₹1,800 for the job. What is A's share?","qhi":"A एक काम 12 दिन में और B 18 दिन में कर सकता है। वे साथ मिलकर काम करते हैं और पूरे काम के ₹1,800 मिलते हैं। A का हिस्सा कितना है?","opts":[{"en":"₹1,080","hi":"₹1,080"},{"en":"₹900","hi":"₹900"},{"en":"₹720","hi":"₹720"},{"en":"₹1,200","hi":"₹1,200"}],"ans":"A","exp":"They work the same time, so wages follow efficiency. LCM(12, 18) = 36: A = 3, B = 2, ratio 3 : 2. A's share = 3/5 × 1,800 = ₹1,080.","exphi":"दोनों समान समय काम करते हैं, इसलिए मज़दूरी कार्यक्षमता के अनुपात में बँटेगी। LCM(12, 18) = 36: A = 3, B = 2, अनुपात 3 : 2। A का हिस्सा = 3/5 × 1,800 = ₹1,080।","src":"note","sec":"s6","id":"n8"},{"q":"Pipes P and Q can fill a reservoir in 15 hours and 20 hours, and a drain pipe R can empty the full reservoir in 30 hours. If all three are opened together, how many hours will it take to fill the empty reservoir?","qhi":"पाइप P और Q एक जलाशय को क्रमशः 15 घंटे और 20 घंटे में भर सकते हैं, और निकास पाइप R भरे जलाशय को 30 घंटे में खाली कर सकता है। तीनों एक साथ खोलें तो खाली जलाशय कितने घंटे में भरेगा?","opts":[{"en":"10 hours","hi":"10 घंटे"},{"en":"14 hours","hi":"14 घंटे"},{"en":"15 hours","hi":"15 घंटे"},{"en":"12 hours","hi":"12 घंटे"}],"ans":"D","exp":"Capacity = LCM(15, 20, 30) = 60 units. P = +4, Q = +3, R = −2 per hour. Net = 5 per hour. Time = 60 ÷ 5 = 12 hours.","exphi":"क्षमता = LCM(15, 20, 30) = 60 इकाई। P = +4, Q = +3, R = −2 प्रति घंटा। नेट = 5 प्रति घंटा। समय = 60 ÷ 5 = 12 घंटे।","src":"bank","sec":"s7","id":"n9"},{"q":"An intake pipe fills a reservoir in 9 hours. Because of a leak it takes 10 hours. When the reservoir is full, in how many hours will the leak alone empty it?","qhi":"एक इनलेट पाइप जलाशय को 9 घंटे में भरता है। रिसाव के कारण 10 घंटे लगते हैं। जलाशय भरा हो तो रिसाव अकेला उसे कितने घंटे में खाली करेगा?","opts":[{"en":"80 hours","hi":"80 घंटे"},{"en":"100 hours","hi":"100 घंटे"},{"en":"90 hours","hi":"90 घंटे"},{"en":"75 hours","hi":"75 घंटे"}],"ans":"C","exp":"Capacity = LCM(9, 10) = 90 units. Inlet = +10/h, net with leak = +9/h. Leak = 10 − 9 = 1 unit/h. It empties the tank in 90 ÷ 1 = 90 hours.","exphi":"क्षमता = LCM(9, 10) = 90 इकाई। इनलेट = +10/घंटा, रिसाव के साथ नेट = +9/घंटा। रिसाव = 10 − 9 = 1 इकाई/घंटा। वह टंकी को 90 ÷ 1 = 90 घंटे में खाली करेगा।","src":"bank","sec":"s7","id":"n10"},{"q":"Pipe A fills a tank in 6 hours and Pipe B in 8 hours. Both are opened together. After 2 hours, Pipe A is closed. How much more time will B take to fill the rest of the tank?","qhi":"पाइप A टंकी को 6 घंटे में और पाइप B 8 घंटे में भरता है। दोनों साथ खोले जाते हैं। 2 घंटे बाद पाइप A बंद कर दिया जाता है। टंकी का शेष भाग भरने में B को और कितना समय लगेगा?","opts":[{"en":"3 hours","hi":"3 घंटे"},{"en":"3 hours 30 minutes","hi":"3 घंटे 30 मिनट"},{"en":"4 hours","hi":"4 घंटे"},{"en":"3 hours 20 minutes","hi":"3 घंटे 20 मिनट"}],"ans":"D","exp":"Capacity = LCM(6, 8) = 24. A = 4/h, B = 3/h. In 2 h: 2 × 7 = 14 units. Left = 10. B needs 10 ÷ 3 = 3 1/3 h = 3 h 20 min.","exphi":"क्षमता = LCM(6, 8) = 24। A = 4/घंटा, B = 3/घंटा। 2 घंटे में: 2 × 7 = 14 इकाई। बचा = 10। B को 10 ÷ 3 = 3 1/3 घंटे = 3 घंटे 20 मिनट लगेंगे।","src":"bank","sec":"s8","id":"n11"},{"q":"Pipes A and B can fill a tank in 16 minutes and 24 minutes. Both are opened together. After how many minutes should B be closed so that the tank is full in 12 minutes in all?","qhi":"पाइप A और B एक टंकी को क्रमशः 16 मिनट और 24 मिनट में भर सकते हैं। दोनों साथ खोले जाते हैं। कुल 12 मिनट में टंकी भरने के लिए B को कितने मिनट बाद बंद करना चाहिए?","opts":[{"en":"8 minutes","hi":"8 मिनट"},{"en":"6 minutes","hi":"6 मिनट"},{"en":"5 minutes","hi":"5 मिनट"},{"en":"7 minutes","hi":"7 मिनट"}],"ans":"B","exp":"Capacity = LCM(16, 24) = 48. A = 3/min, B = 2/min. A runs all 12 min: 36 units. B must supply 48 − 36 = 12 units, which takes 12 ÷ 2 = 6 minutes.","exphi":"क्षमता = LCM(16, 24) = 48। A = 3/मिनट, B = 2/मिनट। A पूरे 12 मिनट चलता है: 36 इकाई। B को 48 − 36 = 12 इकाई देनी है, जिसमें 12 ÷ 2 = 6 मिनट लगते हैं।","src":"bank","sec":"s8","id":"n12"}],"tiles":[["LCM","Total work in units","Efficiency = LCM ÷ days","s1",""],["ab/(a+b)","Two workers together","10 and 15 days → 6 days","s2","a"],["Cycle","Alternate days","Work per 2 days; check last bit","s4",""],["M×D×H","Chain rule","Men × days × hours ÷ work stays equal","s5","a"],["Eff×days","Wages split","Share = efficiency × days worked","s6",""],["ab/(b−a)","Inlet and outlet","6 h and 8 h → 24 h","s7","a"]],"title":"Time, Work and Pipes","sub":"Rate, LCM method, wages, cisterns","hi":"समय, कार्य और पाइप-टंकी","hisub":"","intro":"Ye lecture lagbhag 45 minute ka hai. Time and Work aur Pipes ek hi chapter hain: kaam ko rate samjho, LCM se units banao, aur har sawaal ek hi tareeke se khulta hai. Ek-ek section aaram se lo, worked example khud copy mein lagao, phir end ke 12 questions karo.","kicker":"Quant · Lecture 08","id":"quant-08-time-work-and-pipes"}